The City of New Lisbon, Wisconsin hired Americon Construction to design and build a new public Library.  The project began in 2018 and was recently completed during the summer of 2019.  There were some challenges with the engineering on the pre-existing structure, which forced a complete re-design amid the process, but all challenges were overcome, and the city has a beautiful new library building.

Share